Retrotec Commercial 441 and 451 DucTester Manual do Utilizador Página 51

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 56
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 50
Page 51 of 56
©Retrotec Inc. 2015
Step 2 Prepare the ducts
Determine the Pressure Class
Use specified value. If not specified, use a
Pressure Class of 1 in WC except upstream of VAV
boxes, use 2 in WC. Use a positive test pressure
unless specified otherwise. Test pressure shall not
exceed the Pressure Class according to SMACNA
“HVAC Air Duct Leakage Test Manual”.
Measure duct area
But not if using %
airhandler flow as pass/fail
criteria.
Select a limited section of duct for which the
estimated leakage will not exceed the capacity of
the test apparatus. Measure the duct surface area
in square feet. See Table 11 and Table 12.
Ensure sealing is complete
Ensure sealing materials have cured for the
prescribed time or at least 24 hours OR follow
manufacturer’s directions.
Blank off ductwork
Blank off and seal the tested ductwork by
inserting temporary plugs plates, sheets, balloons,
bags into intentional openings.
Step 3 Connect DucTester to ducts
Attach 4 inch Flange to
ductwork.
Attach 4 inch collar on flex to
flange
Connect DucTester exhaust
to flex
Install Range 47 Flow Plug
Range 47 provides 52 to 206 CFM, which is
sufficient to test most duct runs.
Step 4 DucTester tubing, control and power connections
Connect yellow and green
tubes between DucTester
and gauge
Connect blue tube to gauge
and to ducts using static
probe or connection on
flange
Plug in the Speed Control
Cable between DucTester
and Gauge
Plug in to power source
Vista de página 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56

Comentários a estes Manuais

Sem comentários